| 1. | Lai wan road outside mei foo mtr station exit c1 美孚地铁站c1出口外的湾道 |
| 2. | Professor chan lai wan chairperson , for faculty of engineering 陈丽云教授(主席及工程学院代表) |
| 3. | Lai chi kok public library , g f - 1 f , 19 lai wan road , lai chi kok 荔枝角荔湾道19号地下- 1楼荔枝角公共图书馆 |
| 4. | B construction of slip roads at lai wan interchange and ching cheung road ; and B建造连接荔湾交汇处及程祥道的支路和 |
| 5. | Professor chan lai wan 陈丽云教授 |
| 6. | Professor chan lai wan 陈丽云教授 |
| 7. | Road traffic traffic control regulations chapter 374 - extension of temporary restricted zone at lai wan road , sham shui po 道路交通(交通管制)规例(第374章) - -延长深水?荔湾道临时限制区的实施期限 |
| 8. | The lckv contract include the following major items : construction of 1 . 4km lai chi kok viaduct from lai wan interchange to butterfly valley A建造一条长一点四公里,由西九的荔湾交汇处至蝴蝶谷的高架路 |
| 9. | Road traffic ( traffic control ) regulations ( chapter 374 ) - - extension of temporary restricted zone at lai wan road , sham shui po 道路交通(交通管制)规例(第374章) - -延长深水?荔湾道临时限制区的实施期限 |
| 10. | Lai chi kok viaduct - a 1 . 4 - kilometre dual three lane elevated carriageway from lai wan interchange to butterfly valley 筑建荔枝角高架道路筑建一条长1 . 4公里由荔湾交汇处至蝴蝶谷的双程三线分隔高架车道。 |